All your Writing needs covered

OSH 3304 Unit IV OSHA inspector Case Study – Assignment Solution

Calculate the price
of
your order:

275 words
+
Approximate price
$ 0.00

Instructions   Consider the scenario below. Imagine you are the safety representative on a project with multiple trade activities happening all at once. The project is behind schedule, and the project team is pushing to catch up. There is a concrete pour scheduled for 2:00 AM the next day for the fourth floor in the west wing, and this might help get the project back on track. West wing : In the west wing, the steel has been set, columns have been poured, and the floors are going in. The subcontractor (Apple) concrete workers are sharing the tower crane with the steel erector subcontractor (Berry) to set the floor decking material, and the rebar crews are busy reinforcing steel to get ready for the next floor pour scheduled for 2:00 AM. The mobile crane is lifting rebar and lumber to the floor. Access to the floor is through an extension ladder, which is moved as the reinforcing steel is completed section by section. There are many piles of scrap lumber, reinforcing steel, and wire on the deck; these will be removed at the end of the day by using a forklift to provide a skid pan (mini-dumpster) to load it all in. East wing : In the east wing, which is further along, the floors have been poured, and the roofing subcontractor (Cherry) is working to close it in. There is ladder access between the floors, as the stair pans have not been poured yet, and there are no handrails or stair rails in place. The workers, however, keep going under the danger tape to take a shortcut up the stair pans. Also in the  east wing , the heating, ventilation, and air conditioning (HVAC) subcontractor (Dates) is beginning to install the vertical ductwork, which requires the hole covers in the floors to be removed. The electricians (Elderberry) and plumbers (Figs) are working from ladders to install overhead wires and plumbing lines, and they are sharing whichever ladders are most convenient. In the portion of the  east wing  that has been roofed over, the curtain wall (glass) installers (Guava) have removed the guardrail to install the glass, using an aerial lift. The carpenters who work for the general contractor (Honeydew) have not been notified that the guardrails have been removed. The masons (Kiwi) are working from a  scaffold  to set the brick on the decorative columns that will separate the sections of the building’s face. The roofers (Cherry) are working on the standing seam roof and must traverse the entire roof section. Site wide : There is also one tower crane onsite that belongs to the steel erectors and one mobile crane that belongs to the concrete subcontractor. The tower crane operator is out sick, and the other crane operator belongs to the concrete crew. He normally uses a mobile crane to lift rebar and lumber to his crew but states he has experience with tower cranes, and he has agreed to lift steel beams to the connectors in the east wing when they need them. Additionally, there are multiple forklifts moving material around the site, there are some track hoes belonging to the site contractor (Lemon) working on excavations, and there are also dump trucks removing the excavated material from the site. Workers from all trades are moving throughout the entire site all day. Suddenly, you receive a call from the project manager, who is in the office trailer. The Occupational Safety and Health Administration OSHA inspector has arrived onsite as a result of a complaint. It is not clear who made the complaint; however, it does mention that the roofers have dropped material into the masonry access zone below. The inspector will have to pass through the entire site to reach this area. Draft a response that answers the questions below. · What would your plan consist of for meeting with OSHA inspector ? · What would your plan consist of for meeting with OSHA inspector ? · What would your plan consist of for meeting with OSHA inspector ? · Using the scenario above and OSHA’s multi-employer policy directive, for what types of violations could OSHA inspector cite, and to whom would the citations be issued? Why? · What would your plan consist of for meeting with OSHA inspector ? · After the OSHA inspector inspection, what would be your next course of action to correct these violations? What would your response plan be? · What would your plan consist of for meeting with OSHA inspector ? *Note that you can click on the name of each wing or area for a diagram of the activities that are going on in that area. Your response should be three pages in length, not counting the title or reference pages. You must use at least two academic sources in your response, one of which must be from the CSU Online Library. Adhere to APA Style when creating citations and references for this assignment.
Get Assignment Help Now
  OSHA inspector

Basic features

  • Free title page and bibliography
  • Unlimited revisions
  • Plagiarism-free guarantee
  • Money-back guarantee
  • 24/7 support

On-demand options

  • Writer's samples
  • Part-by-part delivery
  • Overnight delivery
  • Copies of used sources
  • Expert Proofreading

Paper format

  • 275 words per page
  • 12pt Arial/Times New Roman
  • Double line spacing
  • Any citation style (APA, MLA, CHicago/Turabian, Havard)

Guaranteed originality

We guarantee 0% plagiarism! Our orders are custom made from scratch. Our team is dedicated to providing you academic papers with zero traces of plagiarism.

Affordable prices

We know how hard it is to pay the bills while being in college, which is why our rates are extremely affordable and within your budget. You will not find any other company that provides the same quality of work for such affordable prices.

Best experts

Our writer are the crème de la crème of the essay writing industry. They are highly qualified in their field of expertise and have extensive experience when it comes to research papers, term essays or any other academic assignment that you may be given!

Calculate the price of your order

You will get a personal manager and a discount.
We'll send you the first draft for approval by at
Total price:
$0.00

Expert paper writers are just a few clicks away

Place an order in 3 easy steps. Takes less than 5 mins.