Six Sigma DMAIC Project
Execute the improve phase of the Six Sigma DMAIC project including the following:- Identify means to remove the causes of defects.
- Confirm the key variables and quantify their effects on the critical-to-quality characteristics (CTQs).
- Identify the maximum acceptance ranges of the key variables and a system for measuring deviations of the variables.
- Modify the process to stay within an acceptable range.
- Determine how to maintain the improvements.
- Determine how to monitor and control improvements.
- Put tools in place to ensure that the key variables remain within the maximum acceptance ranges under the modified process.